By. SHR

Fabrication and commissioning project for RMQC and RTGC, was performed during March’08 – August’09

Here the photograph of Export Celebration…enjoy it

????????????????????????????????????

Picture 1. SP-PSA RMQC & RTQC Export Celebration Banner

VLUU L100, M100  / Samsung L100, M100

Picture 2. SP-PSA RMQC & RTQC on Barge Ship

ex

Picture 3. General Affair Staff with RMQC and RTQC as background

Export Celebration-01

Picture 4. HRD and EXIM Team with RMQC and RTQC as background

OLYMPUS DIGITAL CAMERA

Picture 5. Woman in action with RMQC and RTQC as background

Export Celebration-1

Picture 6. Design and Engineering Team with RMQC and RTQC as background

????????????????????????????????????

Picture 7. Engineering Manager (Mr. Fajrian) with Executive Director (Mr. DJ. Han)

????????????????????????????????????

Picture 8. Photo of Production-1 Team

OLYMPUS DIGITAL CAMERA

Picture 9. Girl behind the scene

Export Celebration-5

Picture 10. Completely shipment of RMQC and RTGC SP-PSA

????????????????????????????????????

Picture 11. Photo of Engineering Director (Mr. HC. Chung) with Third Party Inspection Team (Bureus Veritas)

Export Celebration-6

Picture 12. Photo of Engineering Lady’s (Ms.Arfiana – Ms. Wiwik Desiani – Ms. Desi Agustina)

SP-PSA-002

Picture 13. Photo of Engineer (Mr. Sugianto – Mr. Diwangga)

SP-PSA-005

Picture 14. Photo of Engineering Behind the screen (Ms. Desi – Mr. Yus  – Mr. Diwangga – Ms. Wiwik)

SP-PSA-006

Picture 15. Photo of Engineering behind the screen (Ms. Desi – Ms. Arfiana  – Ms. Wiwik – Mr. Diwangga)

SP-PSA-007

Picture 16. Photo of Engineering behind the screen (Ms. Ketut – Ms. Arfiana  – Ms. Wiwik)

Advertisements